Adobe Summit EMEA 2019
Tech Specs
Exhibition Area
- To create the light installation, we used four circle truss structures fitted with 84 Robe 150 beam fixtures and 84 DMX-controlled fans.
Plenary
- We used fifteen Barco UDX-4K32 projectors along with ROE CB3 LED panels to create the mammoth 78-metre-wide screen.
- The lighting rig included Clay Paky Sharpy, Martin Aura XB and Martin MAC Viper Performance and Profile fixtures.
Summit Celebration
- To create the perfect stage background to display vibrant video content and allow beams to pass through, our team installed 181 panels of GLUX BAtN LED panels.
- A striking lighting design enhanced the party atmosphere, with Robe LED 150 Beams, Robe BMFL’s, SGM P5s and MAC Viper Wash fixtures featuring in the impressive rig.