Hum TV 2024

Client: Hum TV
Venue: OVO Arena Wembley, London, London
Date: September 2024

"Pakistan's most glamorous awards ceremony requests an Encore for HumTV in Wembley"

Who?

HumTV

What?

9th Auunal Hum Awards

Where?

OVO Arena Wembley, London

When?

28th September 2024


The biggest and best in Pakistani entertainment joined together for a glamorous night of celebration at HUM’s 9th annual award ceremony at London’s iconic Wembley arena, and there was no shortage of memorable moments. Performances and accolades for the likes of Yumna Zaidi, Hamza Sohail, and Mawra Hocane, combined with the glitz of Pakistan’s most famous stars, made for a magical night.

THE IDEA

The HUM team had, to the untrained eye, a wealth of complex requests. To Encore, the brief was simple: one trusted supplier to provide full technical production, matching the exacting expectations and specifications given. These specifications included staging, custom carpentry, LED screens, video control, cameras, sound, lighting, and, of course, exemplary production management throughout the live event. All design ideas came from the brilliant minds at HUM TV, and they relied on Encore to manage seamless technical delivery that would transform their ideas into reality. The scale of the event was not to be underestimated – from both a cultural and a technical perspective. Encore put their best team to work to ensure this was the most spectacular Hum Awards yet.

THE REALITY

Navigating time zones, multiple stakeholders, and a precise visual concept, all within the eight-week turnaround from signoff to delivery, required immediate teamwork between the internal experts of Encore, as well as our production partners at 80six, who provided the high-resolution LED displays that would showcase the event’s dynamic visual content.

The devil is, as always, in the details, and the Encore team focused their initial efforts on meticulously planning the pre-production phase, to ensure seamless installation once onsite.

Once inside Wembley, the team stuck to a tight rigging schedule, which required 90% of the build to be completed in 18 hours. The custom rigging solution featured building a full-size stage, suitable for hundreds of performers and the all-important awards, as well as a combination of flown and ground-stacked LED displays, set at varying angles.

The complexity of the build, combined with specific and rigid time frames, required a rotation of all team members to ensure fresh eyes were always on hand, and to maintain the excellent standards of safety and quality that are expected of Encore.

The proof is in the pudding, as the saying goes, and the result is best seen to be believed. The incredible event was captured from start to finish by our uniquely talented videographer, Bircan Tulga, and reflects the true size and scale of this unforgettable evening.

See how we did it...

HumTV in numbers

1,300

Crew meals

1,136

LED panels

675 sqm

Hi-shine vinyl floor

540

Light fixtures

330

Pieces of truss

180

Stage decks

152

Motor hoists

104

Speakers

100

Staff members on site, each day

25

Amplifiers

17

45ft Articulated lorries

14

Cameras filming in 4K HDR

9

4K canvasses

5

Flown aerial performers

3

Disguise VX4 media servers

1

Extremely happy client